- Executive design and contract execution of the construction works of the Naples-Bari railway line. Treats Frasso Telesino
- Naples-Bari railway line, Cancello-Frasso section [box type=””] [/box] [one_third_last][/one_third_last]
- Completion works of the tunnel called GN1D and of the structures of the Lolli E Giustizia stops, as part of the electrified doubling of the Palermo […]
- Phase 1 tunnel assessment plan under the responsibility of direction VII Pescara section of the A14 Bologna-Bari-Taranto motorway. Idremolition and milling on the cap and / […]
- Civil works for the seismic adaptation of the offices and operational area of the National Control Center of the Terna SPA headquarters Via Palmiano 101 (ROME) […]







