- Construction of the Port Djen Djen-East-West highway Wilaya de Jijel. Algeria site Contractor Rizzani De Eccher s.p.a.
- Construction of the Mala Kapela Natural Gallery (Croatia)
- Excavation and earth moving works. Pitesti site (Romania)
- Construction of the E90 section of the SS 106 Jonica from the Squillace junction to the Simeri Crichi junction and extension work on the SS 280 […]
- Realizzazione al rustico delle stazioni di Parco di Centocelle e Alessandrino della costruenda linea C della Metropolitana di Roma. Committente MetroC S.c.p.A.
- Raw building works of tunnels, artifacts and stations, underground utilities and superficial arrangements of the Affori-Comasina section of line 3 of the Milan underground. Contractor: Metropolitana […]
- SS106 Jonica Nuovo Ponte Fiume Ancinale Soverato (Catanzaro) construction works
- Construction work on the Kramis dam in the Mostaganem wilaya in Algeria. Contractor Astaldi S.p.A.
- Construction works for the Valle Caudina-Pianodardine ring road(Avellino)
- High speed railway line Rome-Napoles, Roma La Rustica junction (Roma) construction works
- Rehabilitation and modernization of the roads of the County of Calarasi – Tronco DJ 402 – DN 4 Curcani – Mariuta – from Km 0 + […]
- High Speed Railway Line – Rome – Naples section: for the Caivano lot (NA), Jacked-box tunnelling -concrete monoliths- under the Naples motorway.
- Executive design and contract execution of the construction works of the Naples-Bari railway line. Treats Frasso Telesino
- High speed railway line Rome Naples, Afragola Lot ( Naples)
- Naples-Bari railway line, Cancello-Frasso section [box type=””] [/box] [one_third_last][/one_third_last]
- Completion works of the tunnel called GN1D and of the structures of the Lolli E Giustizia stops, as part of the electrified doubling of the Palermo […]
- Phase 1 tunnel assessment plan under the responsibility of direction VII Pescara section of the A14 Bologna-Bari-Taranto motorway. Idremolition and milling on the cap and / […]
- Civil works for the seismic adaptation of the offices and operational area of the National Control Center of the Terna SPA headquarters Via Palmiano 101 (ROME) […]
- High Speed railway line– Section – Turin – Milan: Sections of Romentino (NO),Chivasso (TO), Santhià (VC), Novara and Pero (MI): earth works, rail works, special foundations, […]
- High speed railway line – section – Turin – Milan: for sections of Romentino (NO),Chivasso (TO), Santhià (VC), Novara and Pero (MI): earth works, rail works, […]
- High Speed Railway Line – Milan – Bologna section: for the Lots of Fidenza (PR), Piacenza, Casalpusterlengo (LO) and Somaglia (LO): earthworks, railway, piling, special foundations […]
- High Speed Railway Line – Milan – Bologna section: for the Lots of Fidenza (PR), Piacenza, Casalpusterlengo (LO) and Somaglia (LO): earthworks, railway, piling, special foundations […]
- High Speed Railway Line – Milan – Bologna section: for the Lots of Fidenza (PR), Piacenza, Casalpusterlengo (LO) and Somaglia (LO): earthworks, railway, scaffolding, special foundations […]
- High Speed Railway Line – Milan – Bologna section: for the Lots of Fidenza (PR), Piacenza, Casalpusterlengo (LO) and Somaglia (LO): earthworks, railway, scaffolding, special foundations […]
- Construction of the Paci natural tunnel, north and south carriageway as well as all connected works. Client: Reggio Calabria – Scilla S.c.p.A.
- Construction of the Pilone natural tunnel, north and south carriageway as well as all connected works. Contractor: Reggio Calabria – Scilla S.c.p.A.
- Construction of stable structures to protect the existing underground cables and for the embankment defense of the Gallo stream between the municipalities of Villafranca Tirrena and […]
- Ain Defla-Algeri motorway construction. Algeria site. Contractor: Società Italiana per Condotte d’Acqua spa
- Construction of the Saida – Tiaret railway line. Algeria site. Contractor: Astaldi spa
- Construction work on spritz beton installation and rockfall protection network. Algeria site. Contractor: Astaldi spa
- Construction of the 1st lot of the Como ring road, of the 1st lot of the Varese ring road and of the A8-A9 section of the […]
- Operated equipment rental for the “Construction of the S-5 highway on the Nowe Marzy section – Bydgoszcz (POLAND)” Contractor: Pizzarotti & C. S.p.a.
- Construction of the port Djen Djen – El Ulma motorway km 110. Algeria site. Contractor: Rizzani De Eccher s.p.a.
- Construction and completion of the Piale natural tunnel, north and south carriageway as well as all connected works. Contractor: Reggio Calabria – Scilla S.c.p.
- Construction of the High Speed Railway Line Oued Tlelat – Tlemcen. Algeria Site. Contractor: Società Italiana per Condotte d’Acqua spa